Public consultations and environmental impact assessment

The purpose of this section is to provide additional information to environmental impact assessment (EIA) participants in the course of EIA materials development with regard to the projected and other activity being an object of expert review.

Article

Public consultations and environmental impact assessment

After reviewing the documents in this section, the public may communicate their comments and proposals to Exxon Neftegas Limited by using any of the following methods:

  • Fill in and leave the questionnaires in the libraries where the materials are placed
  • By post to Exxon Neftegas Limited at 28 Sakhalinskaya street, Yuzhno-Sakhalinsk 693000, Russia
  • By fax at 8 (4242) 67-71-45
  • By e-mail at enl.environmental@exxonmobil.com

Project Documentation About the Sakhalin-1 Project

All documents are available in Russian language only.

Arkutun-Dagi Block Waste Disposal Site, Disposal of Additional Volumes of Process Wastes in Dagi Offshore Block

First stage of public consultation (May 2, 2019 – May 31, 2019)


Second stage of public consultations (June 1, 2019 – June 30, 2019)

Disposal of Additional Drilling Cuttings and Other Process Wastes at Waste Disposal Facility: Chayvo Offshore License Subsoil Block

First stage of public consultation (August 27, 2019 – September 25, 2019)

Second stage of public consultation (September 27, 2019 – October 26, 2019).

Arkutun-Dagi Field, Berkut Offshore Platform, Group Detailed Design for Well Construction

First stage of public consultations (May 2, 2019 – May 31, 2019)

Second stage of public consultations (June 14, 2019 – June 30, 2019)

Waste Disposal Facility: Odoptu-2 Subsoil Block ‐ Disposal of Drilling Cuttings and Other Process Wastes.

First stage of public consultation (September 17, 2019 – October 16, 2019)

Second stage of public consultation (October 18, 2019 – November 16, 2019)

Odoptu-2 Wellsite (North) – Detailed Design for the Drilling of Wells OP-33 and OP-34

First stage of public consultation (October 11, 2019 – November 10, 2019)

Second stage of public consultation (November 12, 2019 – December 11, 2019)

Detailed design on "Sakhalin-1 Project. Odoptu field. Odoptu 1 Wellsite (South). Batch Drilling of wells"

First stage of public consultation (November 15, 2019 – December 14, 2019)

Related content

Environment and safety

We believe that Sakhalin-1 resources can be developed on the basis of principles of environmental responsibility, meaning the prevention or mitigation of adverse impact through the use of carefully developed design solutions and measures to avoid or mitigate impact.

Environment and safety Topic

Environmental protection policy

It is the policy of the Sakhalin-1 Project and its operator, Exxon Neftegas Limited (ENL), to conduct its business in a manner that is compatible with the balanced environmental and economic needs of the Sakhalin-1 Project communities.

Environment Article

Exxon Neftegas Limited Environmental Reports and Documentation

We believe that Sakhalin-1 resources can be developed on the basis of principles of environmental responsibility, meaning the prevention or mitigation of adverse impact through the use of carefully developed design solutions and measures to avoid or mitigate impact

Environment Article