Public consultations and environmental impact assessment

The purpose of this section is to provide additional information to environmental impact assessment (EIA) participants in the course of EIA materials development with regard to the projected and other activity being an object of expert review.

Topic

Public consultations and environmental impact assessment

After reviewing the documents in this section, the public may communicate their comments and proposals to Exxon Neftegas Limited by using any of the following methods:

  • Fill in and leave the questionnaires in the libraries where the materials are placed
  • By post to Exxon Neftegas Limited at 28 Sakhalinskaya street, Yuzhno-Sakhalinsk 693000, Russia
  • By fax at 8 (4242) 67-71-45
  • By e-mail at enl.environmental@exxonmobil.com

All documents are available in Russian language only.

Arkutun-Dagi Block Waste Disposal Site, Disposal of Additional Volumes of Process Wastes in Dagi Offshore Block

FINAL EIA MATERIALS

Disposal of Additional Drilling Cuttings and Other Process Wastes at Waste Disposal Facility: Chayvo Offshore License Subsoil Block

FINAL EIA MATERIALS

Arkutun-Dagi Field, Berkut Offshore Platform, Group Detailed Design for Well Construction

FINAL EIA MATERIALS

Waste Disposal Facility: Odoptu-2 Subsoil Block ‐ Disposal of Drilling Cuttings and Other Process Wastes.

FINAL EIA MATERIALS

Odoptu-2 Wellsite (North) – Detailed Design for the Drilling of Wells OP-33 and OP-34

FINAL EIA MATERIALS

Detailed design on "Sakhalin-1 Project. Odoptu field. Odoptu 1 Wellsite (South). Batch Drilling of wells"

Program of Comprehensive Offshore Engineering Survey for the Development of Design Documentation under Sakhalin-1 Project. Phase 2 Development. Russia Far East Liquefied Natural Gas Production Complex (LNG). Offshore Facilities

Preliminary Environmental Impact Assessment Materials for Planned Construction and Operation of Sakhalin-1 Phase 2 Capital Construction Facilities

Detailed design on "Sakhalin-1 Project. Batch Drilling of Wells on Chayvo Wellsite"

"The program of marine geophysical surveys at the Chayvo and Arkutun-Dagi fields"

Disposal of Additional Drilling Cuttings and Other Process Wastes at Waste Disposal Facility: Arkutun-Dagi Subsoil Block

Related content

Environment and safety

We believe that Sakhalin-1 resources can be developed on the basis of principles of environmental responsibility, meaning the prevention or mitigation of adverse impact through the use of carefully developed design solutions and measures to avoid or mitigate impact.

Environment Topic

Environmental protection policy

It is the policy of the Sakhalin-1 Project and its operator, Exxon Neftegas Limited (ENL), to conduct its business in a manner that is compatible with the balanced environmental and economic needs of the Sakhalin-1 Project communities.

Environment Topic

Exxon Neftegas Limited Environmental Reports and Documentation

We believe that Sakhalin-1 resources can be developed on the basis of principles of environmental responsibility, meaning the prevention or mitigation of adverse impact through the use of carefully developed design solutions and measures to avoid or mitigate impact

Environment Topic