Topic
Public consultations and environmental impact assessment
The purpose of this section is to provide additional information to environmental impact assessment (EIA) participants in the course of EIA materials development with regard to the projected and other activity being an object of expert review.
Topic
Public consultations and environmental impact assessment
After reviewing the documents in this section, the public may communicate their comments and proposals to Exxon Neftegas Limited by using any of the following methods:
- Fill in and leave the questionnaires in the libraries where the materials are placed
- By post to Exxon Neftegas Limited at 28 Sakhalinskaya street, Yuzhno-Sakhalinsk 693000, Russia
- By fax at 8 (4242) 67-71-45
- By e-mail at enl.environmental@exxonmobil.com
All documents are available in Russian language only.
Arkutun-Dagi Block Waste Disposal Site, Disposal of Additional Volumes of Process Wastes in Dagi Offshore Block
Disposal of Additional Drilling Cuttings and Other Process Wastes at Waste Disposal Facility: Chayvo Offshore License Subsoil Block
Arkutun-Dagi Field, Berkut Offshore Platform, Group Detailed Design for Well Construction
Waste Disposal Facility: Odoptu-2 Subsoil Block ‐ Disposal of Drilling Cuttings and Other Process Wastes.
Odoptu-2 Wellsite (North) – Detailed Design for the Drilling of Wells OP-33 and OP-34
Detailed design on "Sakhalin-1 Project. Odoptu field. Odoptu 1 Wellsite (South). Batch Drilling of wells"
Program of Comprehensive Offshore Engineering Survey for the Development of Design Documentation under Sakhalin-1 Project. Phase 2 Development. Russia Far East Liquefied Natural Gas Production Complex (LNG). Offshore Facilities
Sakhalin-1 Project. Phase 2 Development. Materials of Preliminary Integrated Environmental Impact Assessment
Detailed design on "Sakhalin-1 Project. Batch Drilling of Wells on Chayvo Wellsite"
"The program of marine geophysical surveys at the Chayvo and Arkutun-Dagi fields"
Disposal of Additional Drilling Cuttings and Other Process Wastes at Waste Disposal Facility: Arkutun-Dagi Subsoil Block
Integrated Corporate Oil Spill Response Plan for Exxon Neftegas Limited facilities under Sakhalin-1 Project
Arkutun-Dagi field. Berkut Offshore Platform. Drilling operations
Arkutun-Dagi field. Berkut Offshore Platform. Documentation for drilling operations
Related content
Environment and safety
We believe that Sakhalin-1 resources can be developed on the basis of principles of environmental responsibility, meaning the prevention or mitigation of adverse impact through the use of carefully developed design solutions and measures to avoid or mitigate impact.Environment Topic
Environmental protection policy
It is the policy of the Sakhalin-1 Project and its operator, Exxon Neftegas Limited (ENL), to conduct its business in a manner that is compatible with the balanced environmental and economic needs of the Sakhalin-1 Project communities.Environment Topic
Exxon Neftegas Limited Environmental Reports and Documentation
We believe that Sakhalin-1 resources can be developed on the basis of principles of environmental responsibility, meaning the prevention or mitigation of adverse impact through the use of carefully developed design solutions and measures to avoid or mitigate impactEnvironment Topic